it really is!
it really is!
Pics, Pics who has pics?????
Photobucket has decided it hates me and refuses to upload piccys at the moment but ill try again tonight I hope to get some shots on my way home
Pre-Match drinks?
try the George Hotel , George St
St Helens , A real Saints pub
And the Tesco site
![]()
KNOWSLEY ROAD 1890-2010. A part of history soon to be no more...the place that meant so much to so many people. Farewell old lady, forever in our hearts.
YAY great pics mate
Pre-Match drinks?
try the George Hotel , George St
St Helens , A real Saints pub
spent a lot of time outside at work today! The steelwork is flying up and what looks like a terrace is being built not far away
Just been outside, South Stand well underway
don't forget your darkest hour is only 60 minutes long
KEEP THE FAITH
Gene Hunt BACK ON MONDAY 20th
QUIT YO' JIBBER JABBER
opp emotions to KR coming down but still big gulp.............the atmosphere for the new stadium begins NOW
anybody know how long it will take for the stadium to be finished?
I think it was said Oct/Nov?
Pre-Match drinks?
try the George Hotel , George St
St Helens , A real Saints pub
as long as its ready for next februarys girst game i dont even mind if they run a bit late
mass pour on north stand has started.
Last edited by SaintPeter; 17th March 2011 at 07:46.
well Neither stand is complete so it will look small
Pre-Match drinks?
try the George Hotel , George St
St Helens , A real Saints pub
it looks like the west stand isnt as steep as the south stand
Here's a pic for you of the concrete they brought in.
![]()
Nice pic,wheres Doghead with his daily report seeing as the webcams are down again?
Been down twice today, just got back, loads of people taking a lot of interest in the site now, both the corners of the main stand almost in place, they have also started to build back off the main stand, putting some depth to it all, blackwolf's shot is second only to SC shot the other day.
Elbow room is getting less and less every day as the supermarket gets bigger and the stadium fills out, they have moved loads of machines off site and onto phase two, which gives them a little extra room, only to be filled up with steelwork arranged in build sequence on the floor, they have almost levelled the ground where the new routed gas pipe is, the site is a lot tidier, it is very impressive.